Recently Completed Projects |
Sl. No. |
Name of the Schemes |
Estimated cost |
Upto date progress |
ROADS |
|||
1 |
Construction of 5 m span slab culvert 5 m long for the road beyond Baneswarchak moorum road point to river embankment at Salukkhali. |
4.78 |
Completed |
2 |
Improvement of connectivity in Sutahata Block-I from Amlat-Kukrahati Phase-II.
|
10.40 |
Completed |
3 |
Improvement of connectivity in Sutahata Block-I from Amlat to Kukrahati construction of pipe culvert. |
3.14 |
Completed |
4 |
RCC guard wall of five road from Durgachak railway level crossing to Hindustan Lever and Hooghly river ring road junction at Haldia. |
259.88 |
Completed |
5 |
Gr-A – Construction of road from Haldia Utsab Bhawan to Gandhinagar colony behind Haldia Court complex – C stage work. |
60.70 |
Completed |
6 |
Structuring and widening of the road from the corner of Public Health Complex to proposed Bus Terminus at Geonkhali. |
146.38 |
Completed |
7 |
150 m dia eucalyptus bullah pilling including drum sheet walling for the stretch from Gholepukur to Ranichak Girir Bazar. |
14.88 |
Completed |
8 |
Internal roads along Mansatala canal zone-A |
19.88 |
Completed |
9 |
Internal roads new colony at Durgachak zone-B |
19.09 |
Completed |
10 |
Construction of different internal roads and protective work with close bamboo pilling work at new colony Durgachak zone-C |
16.32 |
Completed |
11 |
Construction of different internal roads and protective work with eucalyptus bullah pilling and close bamboo pilling work at old colony Durgachak zone-D. |
16.91 |
Completed |
12 |
Construction of Sutahata – Horekhali bye pass road. |
50.15 |
Completed |
13 |
Construction of upgradation of internal road at Ramnagar Rehab. Colony . |
17.50 |
Completed |
14 |
Construction of road from Terapekhiya to Harikhali Kalpana brick field. |
168.72 |
Completed |
15 |
Construction of road from Piyada to Mirpur (Donipurhat) connecting river embankment. |
98.44 |
Completed |
16 |
Construction of road from Jhoupatra to Bakultala via Kalikakundu |
138.62 |
40% |
17 |
(B) Construction of road from HPL link road to Durgachak level crossing along Mansatala canal. |
44.43 |
Completed |
18 |
Construction of internal roads inside Gandhinagar Rehab. Colony. |
119.07 |
Completed |
19 |
Construction of concrete road from Bijoy Addya’s house to Angad Dolai’s house via Sital Bhowmick house upto Kumarchak Purba, under Ward & of Haldia Municipality in 7 phases. |
34.63 |
Completed |
20 |
Construction of concrete road from Dighasipur Chunghar to Doro Bandh under ward no. 15 |
19.55 |
Completed |
21 |
Construction of internal road at extension of Raghunathchak rehab. Colony. |
19.26 |
Completed |
22 |
Strengthening of the existing road from Chaitanyapur to Balughata. |
194.10 |
Completed |
23 |
Strengthening of the existing embankment road from MCPI to the junction of HPCL. |
43.98 |
Completed |
24 |
Construction of tourist road (balance work) and allied works beside Medical College site. |
19.21 |
Completed |
25 |
Repairing to the road from HPL Link Road (Kashbere) upto HBCPL, Haldia via IndianOil Petronus. |
9.99 |
Completed |
26 |
Improvement of connectivity from Amlat to Kukrahati Phase –II Drum sheet walling |
10.40 |
Completed |
27 |
Construction of culvert etc at Buneswarchak. |
5.00 |
Completed |
28 |
Terapekhiya Mahishadal road to Rambag. |
5.00 |
Completed |
29 |
BMS programme Bituminous job of bye-pass road Sutahata to Horekhali. |
50.00 |
Completed |
30 |
RCC Guard Wall from Durgachak Rly. Level crossing to HLL via Hooghly River embankment. |
11.70 |
Completed |
31 |
Emergent Repairing of Meghnad Saha Polytechnic to HIT |
15.00 |
Completed |
32 |
Emergent repairing of Ranichakmore to Khudiramnagar. |
19.52 |
Completed |
33 |
Drum sheet walling on road from Galpukur to Ranichak Girir Bazar. |
14.88 |
Completed |
34 |
Strengthening and widening of the road from Ranichak more (NH-41) to Law College point. |
228.64 |
Completed |
35 |
Strengthening and widening of the road from Law College point to Kshudiram Nagar colony via HIT. |
205.83 |
Completed |
36 |
Strengthening and widening of the road from Meghnad Saha Polytechnic point to the crossing of the roade connecting HIT. |
271.34 |
Completed |
37 |
Construction of Moorum road in various locality of Kshudiram Nagar (Part – I) |
5.24 |
Completed |
38 |
Construction of proposed industrial road taking off from main road near Manaksia Ltd. |
16.74 |
Completed |
39 |
Construction of proposed industrial road taking off from HPL Link Road for providing connectivity to small scale industries on the west side of Mansatala canal. |
14.95 |
Completed |
40 |
Construction of Moorum road in various locality of Kshudiram Nagar (Part – II) |
10.67 |
Completed |
41 |
Construction of Moorum road in various locality of Kshudiram Nagar (Part – III) |
4.20 |
Completed |
42 |
Schedule for strengthening and improvement of road from HPL Link Road to EMAMI Factory. |
22.51 |
Completed |
43 |
Schedule for strengthening and inprovement of road from HPL Link Road to ECL Factory, Haldia |
11.78 |
Completed |
44 |
Internal Decoration work for supplying providing preparing erecting and fixing wooden partition (A) |
3.57 |
Completed |
45 |
Internal Decoration work for supplying providing preparing erecting and fixing Table (B) |
5.50 |
Completed |
46 |
Internal Decoration work for supplying providing preparing erecting and fixing Show-piece (cabinet / nitches) (C) |
4.17 |
Completed |
47 |
Internal Decoration work for supplying providing preparing erecting and fixing Gypsum false / drop ceiling (D) |
7.57 |
Completed |
48 |
Internal Decoration work for supplying providing preparing erecting and fixing wooden Box in wall & ceiling (E) |
4.00 |
Completed |
49 |
Internal Decoration work for supplying providing preparing erecting and fixing (i) wooden partition with float glass and (ii) wooden partition with glass bead etc. (F) |
4.11 |
Completed |
50 |
Internal Decoration work for supplying providing preparing and fixing Wall paneling (G) |
4.95 |
Completed |
51 |
Internal Decoration work for supplying providing preparing and fixing Door, Door Frame, Cornish, Pelmet, moulding beat (H) |
5.75 |
Completed |
52 |
Construction of road from Amlat to Bangopalpur |
46.64 |
Completed |
53 |
Road marking on Chaitanyapur to Balughata Road. |
23.31 |
Completed |
54 |
Construction of 2 nos. slab culvert at Geonkhali under Betkundu Gram Panchayet. |
0.89 |
Completed |
55 |
Construction of internal extension roads inside Gandhinagar Rehabilitation Colony for “A” & “B” stage work. |
21.45 |
Completed |
56 |
Road marking on Chaitanyapur to Balughata Road. |
23.31 |
Completed |
57 |
Construction of hume pipe culvert at Amlat to Kukrahati Phase – II. |
3.74 |
Completed |
58 |
a. Construction of concrete road from Nandakumar, NH-41 to District Child Welfare Society, Nandakumar. |
5.97+2.30 = 8.27 |
Completed |
59 |
Repairing of the road starting from NH-41 to CIPET near City Centre, Debhog |
2.49 |
Completed |
60 |
Bathroom in Children Park at Durgachak Super Market. |
2.70 |
Completed |
61 |
Construction of relaying B.F.S. in the market area & eucalyptus bullah pilling at Gandhinagar Colony, behind Haldia Court Complex – Group - A |
20.02 |
Completed |
62 |
Construction of relaying B.F.S. in the market area & eucalyptus bullah pilling at Gandhinagar Colony, behind Haldia Court Complex – Group - B |
|
Completed |
63 |
Procurement of DICL Pipe (dia 600 mm) for Hooghly Met Coke |
150.00 |
Completed |
64 |
Construction of proposed Industrial road along west side of Mansatala Canal. Length : 200 M |
14.95 |
Completed |
65 |
Construction of road from SH-4 (Srikrishnapur) to Solid Waste Management. |
68.87 |
Completed |
66 |
Construction of concrete road from Barsundra to Kalibazar under Haldia Panchayat Samity and within the Gram Panchayat of Baruttar Hingly. Part – I (Starting point Barsundra G.P. Office) |
29.94 |
Completed |
67 |
Construction of concrete road from Barsundra to Kalibazar under Haldia Panchayat Samity and within the Gram Panchayat of Baruttar Hingly. Part – II (Starting point Barsundra G.P. Office) |
29.95 |
Completed |
68 |
Construction of concrete road from Dasmore to Burabari crossing via Manoharpur High Scool Part – I (Starting point Dasmore) |
51.17 |
Completed |
69 |
Construction of concrete road from Dasmore to Burabari crossing via Manoharpur High Scool Part – II (Starting point Dasmore) |
22.50 |
Completed |
70 |
Construction of road from Haldia Block Office to Suklalchak High school via Dalimbachak Prathamik Vidyalaya. Part – I (Strating point from Haldia Block Office) |
30.04 |
Completed |
71 |
Construction of road from Haldia Block Office to Suklalchak High school via Dalimbachak Prathamik Vidyalaya. Part – II (Strating point from Haldia Block Office) |
22.46 |
Completed |
72 |
Construction of 1.5 M span RCC slab culvert (3 nos.) drain and baffle wall on the road of Law College Point to Kshudiram Nagar. Phase - A |
15.09 |
Completed |
73 |
Construction of 1.5 M span RCC slab culvert (2 nos.) on the road of Ranichak More to Law College Point. Phase - B |
8.23 |
Completed |
74 |
Construction of 1.5 M span RCC slab culvert (1 no.) in between Meghnad Saha Polytechnic Road and Law College. Phase - C |
4.09 |
Completed |
75 |
Strengthening of road from Chaitanyapur – Kukrahati road to Netra Niramay Niketan. |
2.89 |
Completed |
Land Development |
|||
1 |
Carried earth filling etc. in between Gandhinagar Colony and compound wall of court and Golden Retreat. |
65.02 |
Completed |
2 |
Land filling at the permanent site of Jawahar Navodaya Vidyalaya, Purba Medinipur, Kapaseria. |
115.05 |
Completed |
3 |
Land filling at Bhabanipur Rehabilitation Colony (Ph-II) |
212.88 |
Completed |
4 |
Land development and construction of internal road at extension of Raghunathchak rehab. Colony. |
20.89 |
Completed |
5 |
Earth filling at Gandhinagar Colony |
65.00 |
Completed |
6 |
Land development around HDA Administrative Building. |
7.99 |
Completed |
7 |
Land development of Sanghati Maidan (Part – II) |
135.37 |
Completed |
8 |
Land Development work at Dangamore near Geonkhali PHE Project. |
5.18 |
Completed |
9 |
Land development at extension of Raghunathchak Rehabilitation colony at Kumarchak. |
6.78 |
Completed |
10 |
Land filling at Jhikurkhali |
192.05 |
Completed |
Infrastructure |
|||
1 |
Construction of Kalpana Chowla Hostel building of Vivekananda Mission Mahavidyalaya at Rampur, Chaitanyapur. |
9.99 |
Completed |
2 |
Construction of boundary wall for municipality waste area. |
30.00 |
Completed |
3 |
Balance for Primary Health Centre |
92.00 |
Completed |
4 |
Construction of boundary wall, Security room, Grill, Main gate, roads, drain, kerbs etc. for land scaping around HDA Administrative Building. |
44.72 |
Completed |
5 |
Reapiring of Mahishadal Rural Hospital |
4.53 |
Completed |
6 |
Renovation of Haldia Holiday Home of WB Labour Welfare Board. |
2.11 |
Completed |
7 |
Weather coat on Super Market Building at Durgachak, Haldia. |
3.45 |
Completed |
Water Supply |
|||
1 |
Augmentation of existing 20 MGD Water Treatment Plant by additional. |
2700.00 |
Completed |
2 |
Construction of under ground water reservoir at Mahishadal Hospital Complex. |
1.27 |
Completed |
3 |
Construction of Pump House, Pipeline, fixing of motor etc. at Mahishadal Hospital Complex. |
1.63 |
Completed |
Housing |
|||
1 |
Construction of 46 (G+2) flats at Hatiberia. |
429.00 |
Completed |
2 |
Urgent repairing work of “N” block, inner side at Priyambada Housing Estate, Basudevpur |
3.49 |
Completed |
Drainage |
|||
1 |
Construction of Cross Drain, 2.50M Culvert, demarcation pillar inside Geonkhali Rehabilitation Colony |
24.07 |
Completed |
2 |
Construction of cross drain for Nivedita Rehabilitation Colony at Bhabanipur. |
3.13 |
Completed |
3 |
Construction of Cross Drainage structures of road from Terapekhiya Mahishadal road to Super Market at Mahishadal. |
10.00 |
Completed |
4 |
Surface Drain at PHE Complex. |
4.15 |
Completed |
Electrification |
|||
1 |
Electrification work of residential cum commercial complex at Haldia Township near Mohana Market |
5.09 |
Completed |
2 |
Electrification at Kumarchak Rehabilitation Colony (JL-133) |
10.57 |
Completed |