Recently Completed Projects

 

Sl. No.

Name of the Schemes

Estimated cost
(Rs. in lac)

Upto date progress

ROADS

1

Construction of 5 m span slab culvert 5 m long for the road beyond Baneswarchak moorum road point to river embankment at Salukkhali.

4.78

Completed

2

Improvement of connectivity in Sutahata Block-I from Amlat-Kukrahati Phase-II.

  • Construction of slab culvery and pipe culvert.
  • Drumsheet walling.

10.40

Completed

3

Improvement of connectivity in Sutahata Block-I from Amlat to Kukrahati construction of pipe culvert.

3.14

Completed

4

RCC guard wall of five road from Durgachak railway level crossing to Hindustan Lever and Hooghly river ring road junction at Haldia.

259.88

Completed

5

Gr-A – Construction of road from Haldia Utsab Bhawan to Gandhinagar colony behind Haldia Court complex – C stage work.
Gr-B – do
A & B Stage work.

60.70

Completed

6

Structuring and widening of the road from the corner of Public Health Complex to proposed Bus Terminus at Geonkhali.

146.38

Completed

7

150 m dia eucalyptus bullah pilling including drum sheet walling for the stretch from Gholepukur to Ranichak Girir Bazar.

14.88

Completed

8

Internal roads along Mansatala canal zone-A

19.88

Completed

9

Internal roads new colony at Durgachak zone-B

19.09

Completed

10

Construction of different internal roads and protective work with close bamboo pilling work at new colony Durgachak zone-C

16.32

Completed

11

Construction of different internal roads and protective work with eucalyptus bullah pilling and close bamboo pilling work at old colony Durgachak zone-D.

16.91

Completed

12

Construction of Sutahata – Horekhali bye pass road.

50.15

Completed

13

Construction of upgradation of internal road at Ramnagar Rehab. Colony .

17.50

Completed

14

Construction of road from Terapekhiya to Harikhali Kalpana brick field.

168.72

Completed

15

Construction of road from Piyada to Mirpur (Donipurhat) connecting river embankment.

98.44

Completed

16

Construction of road from Jhoupatra to Bakultala via Kalikakundu

138.62

40%

17

(B) Construction of road from HPL link road to Durgachak level crossing along Mansatala canal.

44.43

Completed

18

Construction of internal roads inside Gandhinagar Rehab. Colony.

119.07

Completed

19

Construction of concrete road from Bijoy Addya’s house to Angad Dolai’s house via Sital Bhowmick house upto Kumarchak Purba, under Ward & of Haldia Municipality in 7 phases.

34.63

Completed

20

Construction of concrete road from Dighasipur Chunghar to Doro Bandh under ward no. 15

19.55

Completed

21

Construction of internal road at extension of Raghunathchak rehab. Colony.

19.26

Completed

22

Strengthening of the existing road from Chaitanyapur to Balughata.

194.10

Completed

23

Strengthening of the existing embankment road from MCPI to the junction of HPCL.

43.98

Completed

24

Construction of tourist road (balance work) and allied works beside Medical College site.

19.21

Completed

25

Repairing to the road from HPL Link Road (Kashbere) upto HBCPL, Haldia via IndianOil Petronus.

9.99

Completed

26

Improvement of connectivity from Amlat to Kukrahati Phase –II Drum sheet walling

10.40

Completed

27

Construction of culvert etc at Buneswarchak.

5.00

Completed

28

Terapekhiya Mahishadal road to Rambag.

5.00

Completed

29

BMS programme Bituminous job of bye-pass road Sutahata to Horekhali.

50.00

Completed

30

RCC Guard Wall from Durgachak Rly. Level crossing to HLL via Hooghly River embankment.

11.70

Completed

31

Emergent Repairing of Meghnad Saha Polytechnic  to HIT

15.00

Completed

32

Emergent repairing of Ranichakmore to Khudiramnagar.

19.52

Completed

33

Drum sheet walling on road from Galpukur to Ranichak Girir Bazar.

14.88

Completed

34

Strengthening and widening of the road from Ranichak more (NH-41) to Law College point.
Length-1165 m

228.64

Completed

35

Strengthening and widening of the road from Law College point to Kshudiram Nagar colony via HIT.
Length-1185 m

205.83

Completed

36

Strengthening and widening of the road from Meghnad Saha Polytechnic point to the crossing of the roade connecting HIT.
Length-1050 m

271.34

Completed

37

Construction of Moorum road in various locality of Kshudiram Nagar (Part – I)

5.24

Completed

38

Construction of proposed industrial road taking off from main road near Manaksia Ltd.

16.74

Completed

39

Construction of proposed industrial road taking off from HPL Link Road for providing connectivity to small scale industries on the west side of Mansatala canal.

14.95

Completed

40

Construction of Moorum road in various locality of Kshudiram Nagar (Part – II)

10.67

Completed

41

Construction of Moorum road in various locality of Kshudiram Nagar (Part – III)

4.20

Completed

42

Schedule for strengthening and improvement of road from HPL Link Road to EMAMI Factory.

22.51

Completed

43

Schedule for strengthening and inprovement of road from HPL Link Road to ECL Factory, Haldia

11.78

Completed

44

Internal Decoration work for supplying providing preparing erecting and fixing wooden partition (A)

3.57

Completed

45

Internal Decoration work for supplying providing preparing erecting and fixing Table (B)

5.50

Completed

46

Internal Decoration work for supplying providing preparing erecting and fixing Show-piece (cabinet / nitches) (C)

4.17

Completed

47

Internal Decoration work for supplying providing preparing erecting and fixing Gypsum false / drop ceiling (D)

7.57

Completed

48

Internal Decoration work for supplying providing preparing erecting and fixing wooden Box in wall & ceiling (E)

4.00

Completed

49

Internal Decoration work for supplying providing preparing erecting and fixing (i) wooden partition with float glass and (ii) wooden partition with glass bead etc. (F)

4.11

Completed

50

Internal Decoration work for supplying providing preparing and fixing Wall paneling (G)

4.95

Completed

51

Internal Decoration work for supplying providing preparing and fixing Door, Door Frame, Cornish, Pelmet, moulding beat  (H)

5.75

Completed

52

Construction of road from Amlat to Bangopalpur

46.64

Completed

53

Road marking on Chaitanyapur to Balughata Road.

23.31

Completed

54

Construction of 2 nos. slab culvert at Geonkhali under Betkundu Gram Panchayet.

0.89

Completed

55

Construction of internal extension roads inside Gandhinagar Rehabilitation Colony for “A” & “B” stage work.

21.45

Completed

56

Road marking on Chaitanyapur to Balughata Road.

23.31

Completed

57

Construction of hume pipe culvert at Amlat to Kukrahati Phase – II.

3.74

Completed

58

a. Construction of concrete road from Nandakumar, NH-41 to District Child Welfare Society, Nandakumar.
b.Construction of road from Nandakumar (MH-41) to District child Welfare Society, Nandakumar (Extra work).

5.97+2.30 = 8.27

Completed

59

Repairing of the road starting from NH-41 to CIPET near City Centre, Debhog

2.49

Completed

60

Bathroom in Children Park at Durgachak Super Market.

2.70

Completed

61

Construction of relaying B.F.S. in the market area & eucalyptus bullah pilling at Gandhinagar Colony, behind Haldia Court Complex – Group - A

20.02

Completed

62

Construction of relaying B.F.S. in the market area & eucalyptus bullah pilling at Gandhinagar Colony, behind Haldia Court Complex – Group - B

 

Completed

63

Procurement of DICL Pipe (dia 600 mm) for Hooghly Met Coke

150.00

Completed

64

Construction of proposed Industrial road along west side of Mansatala Canal. Length : 200 M

14.95

Completed

65

Construction of road from SH-4 (Srikrishnapur) to Solid Waste Management.

68.87

Completed

66

Construction of concrete road from Barsundra to Kalibazar under Haldia Panchayat Samity and within the Gram Panchayat of Baruttar Hingly. Part – I (Starting point Barsundra G.P. Office)

29.94

Completed

67

Construction of concrete road from Barsundra to Kalibazar under Haldia Panchayat Samity and within the Gram Panchayat of Baruttar Hingly. Part – II (Starting point Barsundra G.P. Office)

29.95

Completed

68

Construction of concrete road from Dasmore to Burabari crossing via Manoharpur High Scool  Part – I (Starting point Dasmore)

51.17

Completed

69

Construction of concrete road from Dasmore to Burabari crossing via Manoharpur High Scool  Part – II (Starting point Dasmore)

22.50

Completed

70

Construction of road from Haldia Block Office to Suklalchak High school via Dalimbachak Prathamik Vidyalaya. Part – I (Strating point from Haldia Block Office)

30.04

Completed

71

Construction of road from Haldia Block Office to Suklalchak High school via Dalimbachak Prathamik Vidyalaya. Part – II (Strating point from Haldia Block Office)

22.46

Completed

72

Construction of 1.5 M span RCC slab culvert (3 nos.) drain and baffle wall on the road of Law College Point  to Kshudiram Nagar. Phase - A

15.09

Completed

73

Construction of 1.5 M span RCC slab culvert (2 nos.) on the road of Ranichak More to Law College Point. Phase - B

8.23

Completed

74

Construction of 1.5 M span RCC slab culvert (1 no.) in between Meghnad Saha Polytechnic Road and Law College. Phase - C

4.09

Completed

75

Strengthening of road from Chaitanyapur – Kukrahati road to Netra Niramay Niketan.

2.89

Completed

Land Development

1

Carried earth filling etc. in between Gandhinagar Colony and compound wall of court and Golden Retreat.

65.02

Completed

2

Land filling at the permanent site of Jawahar Navodaya Vidyalaya, Purba Medinipur, Kapaseria.

115.05

Completed

3

Land filling at Bhabanipur Rehabilitation Colony (Ph-II)

212.88

Completed

4

Land development and construction of internal road at extension of Raghunathchak rehab. Colony.

20.89

Completed

5

Earth filling at Gandhinagar Colony

65.00

Completed

6

Land development around HDA Administrative Building.

7.99

Completed

7

Land development of Sanghati Maidan (Part – II)

135.37

Completed

8

Land Development work at Dangamore near Geonkhali PHE Project.

5.18

Completed

9

Land development at extension of Raghunathchak Rehabilitation colony at Kumarchak.

6.78

Completed

10

Land filling at Jhikurkhali

192.05

Completed

Infrastructure

1

Construction of Kalpana Chowla Hostel building of Vivekananda Mission Mahavidyalaya at Rampur, Chaitanyapur.

9.99

Completed

2

Construction of boundary wall for municipality waste area.

30.00

Completed

3

Balance for Primary Health Centre

92.00

Completed

4

Construction of boundary wall, Security room, Grill, Main gate, roads, drain, kerbs etc. for land scaping around HDA Administrative Building.

44.72

Completed

5

Reapiring of Mahishadal Rural Hospital

4.53

Completed

6

Renovation of Haldia Holiday Home of WB Labour Welfare Board.

2.11

Completed

7

Weather coat on Super Market Building at Durgachak, Haldia.

3.45

Completed

Water Supply

1

Augmentation of existing 20 MGD Water Treatment Plant by additional.

2700.00

Completed

2

Construction of under ground water reservoir at Mahishadal Hospital Complex.

1.27

Completed

3

Construction of Pump House, Pipeline, fixing of motor etc. at Mahishadal Hospital Complex.

1.63

Completed

Housing

1

Construction of 46 (G+2) flats at Hatiberia.

429.00

Completed

2

Urgent repairing work of “N” block, inner side at Priyambada Housing Estate, Basudevpur

3.49

Completed

Drainage

1

Construction of Cross Drain, 2.50M Culvert, demarcation pillar inside Geonkhali Rehabilitation Colony

24.07

Completed

2

Construction of cross drain for Nivedita Rehabilitation Colony at Bhabanipur.

3.13

Completed

3

Construction of Cross Drainage structures of road from Terapekhiya Mahishadal road to Super Market at Mahishadal.

10.00

Completed

4

Surface Drain at PHE Complex.

4.15

Completed

Electrification

1

Electrification work of residential cum commercial complex at Haldia Township near Mohana Market

5.09

Completed

2

Electrification at Kumarchak Rehabilitation Colony (JL-133)

10.57

Completed

 

 

 