Sl. No. |
Name of the Schemes |
Estimated cost |
Upto date progress |
1 |
Construction of road from Gholepukur to Tekhali Bridge via Amdabad High School (Part-A). |
235.82 |
Ongoing |
2 |
Construction of bituminous road from SBSTC bus stand to NH-41. |
154.87 |
Ongoing |
3 |
Land development work for bituminous road at Rajarampur Rehabilitation Colony (Part-A & Part-B). - E.W. |
79.52 |
Ongoing |
4 |
Construcion of concrete road from Brajalalchak Pramaniksura to Basanchak Bazar, Length-3.8 Km. |
79.13 |
Ongoing |
5 |
Construction of Moorum road at Baneshwarchak for diversion of existing moorum road inside proposed power plant CESC ltd. |
106.08 |
Ongoing |
6 |
Up-gradation of road & surface drain at Kumarchak-I block Rehabilitation Colony near 44 Flat Complex. |
20.21 |
Ongoing |
7 |
Up-gradation of road from moorum topping to bituminous surfacing at Priyambada Housing from Additional S.P.'s office to Basudevpur – 350 Mtr. |
5.23 |
Ongoing |
8 |
Up-gradation of road (bituminous) at Adani Wilmer road to HPL Link road with Box Culvert. |
63.82 |
Ongoing |
9 |
a) Construction of Bituminous Main Road at Chakdwipa Rehabilitation Colony (for WBM & Bituminous road).Total Length = 248.00 mtr. |
17.29 |
Ongoing |
10 |
Purba Raghunathchak Rehabilitation Colony – Up-gradation of roads and remaining parts. |
76.55 |
Ongoing |
11 |
Construction of roads, drains & culverts at Bhabanipur Rehabilitation Colony, Phase-III. |
119.77 |
Ongoing |
12 |
Repairing of road from Sutahata bazaar to Hoerkhali. |
87.05 |
Ongoing |
13 |
Construction of concrete road from Dalimbachak Kaltala to Barobari Shibmandir via Adhikary Para. |
72.32 |
Ongoing |
14 |
Repairing of road from Biswanath Duttarchak more to Hatiberia Bus stand via Bharatiya Vidyabhawan School and Shataku Housing. |
17.15 |
Ongoing |
15 |
Plot filling at Bhabanipur Rehabilitation Colony, Phase-II. |
19.27 |
Ongoing |
16 |
Sinking of 12 nos. Tube Well at different places under Haldia Municipality - Funded from MPLADS. |
13.39 |
Ongoing |
17 |
Composite work for proposed District Head Quarter at Nimtouri Tamluk, Purba Medinipur. Phase-I : Construction of road. Phase-II : Construction of cross drainage work. Phase-III : Land Development work by carried earth and fly ash. Phase-IV : Construction |
1668.70 |
Ongoing |
18 |
Construction of Main College Building of 2nd campus of Dr. Meghnath Saha Institute of Technology, Haldia from foundation to 2nd floor along with sanitary plumbing works complete in all respects. |
694.42 |
Ongoing |
19 |
Repairing of Steel Bridge at Tentulberia on the road from Railway Crossing to Geonkhali Water Treatment Plant (Phase-I). |
29.78 |
Ongoing |
20 |
Miscellaneous civil works for renovation of Children's Park at Durgachak. |
2.02 |
Ongoing |
21 |
Construction of Boundary Wall at Haldia Trade Centre, Ranichack Haldia. |
20.15 |
Ongoing |
22 |
Painting of boundary wall including necessary repairing and re-construction at Haldia Bhawan. |
3.08 |
Ongoing |
23 |
Durgachak Super Market – Miscellaneous works such as Drain, Cover Slab, Sanitary, Plumbing etc. |
6.57 |
Ongoing |
24 |
Additional work for repairing and strengthening of Steel Bridge at Tentulberia on the road from Railway Crossing to Geonkhali Water Treatment Plant (Phase-II). |
25.76 |
Ongoing |
25 |
Electrification of Maharaja Nandakumar College |
1.98 |
Ongoing |
26 |
Electrification work of Food Park (Including electrical Connection). |
124.15 |
Ongoing |
27 |
Shifting of 11 K.V O.H line from the proposed site of lions Club, Vocational Training Institute & Paranchak high school at purba srikrishnapur, Haldia. |
8.23 |
Ongoing |
28 |
Electrification of Chakdwipa Rehabilitation Colony. |
0.25 |
Ongoing |
29 |
Electrification of Block E, F & G of Purba Srikrishnapur, Rehabilitation Colony. |
18.39 |
Ongoing |
30 |
Conversion of Bulk power supply to L & MV power supply at Staff Quarter, Tribeni sangam and other similar Building attached with the Geonkhali Water Treatment Plant. |
17.45 |
Ongoing |
31 |
Extension of existing grid at Basanchak, Barbajitpur, Banskona Jalpai under Haldia Panchayat Samity. |
5.04 |
Ongoing |
32 |
Electrification of Bar-Mohanpur and Hariballavpur under Sutahata Panchayat Samity |
4.60 |
Ongoing |
33 |
Electrification of Ramchandrapur, Barada & Bijayrampur under Sutahata Panchayat Samity |
5.85 |
Ongoing |
34 |
Electrification of Monirampur Netaji Sangha, Monirampur Manasa Mandir under Sutahata Panchayat Samity |
5.58 |
Ongoing |
35 |
Electrification of Gobindapur Chakraborty Para and Bhowmick Para and Anarpur under Sutahata Panchayat Samity |
5.16 |
Ongoing |
36 |
Extension of existing grid at Barbasudevpur Kuity Para, Chaulkhola Daspara, Gorankhali & Jamberia, Iswardha Jalpai, Malpara (Dwariberia), Brajalalchak (Palpara west side) under Haldia Panchayat Samity. |
3.91 |
Ongoing |
37 |
Extension of existing grid at Gorankhali, Sapua, Barbasudevpur, Suklalchak, Hadia under Haldia Panchayat Samity. |
2.18 |
Ongoing |
38 |
Electrification of Barbajitpur 43 No. Booth Paul / Sk. Para (Dakshin Pally) (59), Barbajitpur 44 No. Booth Das Pally to Sitala Mandir / Sk. Para (59), Barabari Dakshin Pally and Paschim Pally (60), Chaulkhaola Dakshin near sushil Samanta’s house (93), Barsuklalchak Din Para, Dwariberia (P.S. Sutaha), Banskhana Jalpai (Beltala), P.S. Bhabanipur, Dalimbachak Patra Pally (Kumarpur) under Haldi Panchayet Samity. |
14.67 |
Ongoing |
39 |
Installation Road Traffic Signal System at Brajalalchak, Manjushree, Chaitnyapur,Ranichak |
22.71 |
Ongoing |
40 |
Drawal of 11KV Line from Manoharpur to Chaulkhola Daspara |
3.38 |
Ongoing |